The Project will consist of open pit mining services including drilling, blasting, loading and hauling. The duration of the initial contract is five years.
Works include:
- Load and Haul using a fleet of 9200 Excavators and 140t class dump trucks with a combination of direct feed and wheel loader ROM feed
- Drill and Blast of all mined material (including design)
- Rehandle of wet reject material from the plant
- Crusher feed both direct tip and rehandle