Alkane Resources Ltd (Alkane) has engaged MIQ to complete a Front End Engineering Design (FEED) for an upgrade to the Tomingley Gold Operation (TGO) processing plant to include a rougher flotation recovery circuit, ultrafine grinding, CIL pre-leach thickener, and flotation reagent preparation.
The FEED phase is to be completed prior to detailed engineering, and construction.
During the FEED, the following critical activities will be completed:
- Finalisation of key Project Specification and Project Standards.
- Award of long lead equipment items (including expediting of associated engineering data).
- Development of cornerstone project drawings and documents required to finalise the Project’s scope, costs and execution program by detailed work breakdown structure.
- Review of metallurgical testwork results.
Amount: $8.3M